Our highly skilled and experienced engineers work closely with each client to provide tailored design solutions and meet their specific needs. We then develop the design using detailed engineering that will ensure the performance required by our clients.
Based on detailed engineering, procurement of materials is made in preparation for the execution stage. We have a proven track record in successfully managing multiple suppliers and service providers interfaces.
With the right, safe and cost-effective means, we are sure to handle the most delicate installation and commissioning tasks, putting at your disposal our best vessels and teams.
Engineering, procurement and construction activities for the installation of a tripod jacket as a Wellhead Platform.
Towing of a Jack Up Rig (Jawhara 05) from stand-by position to final location, approach and positioning on the wellhead platform for the drilling job.
Salvage of a CALM Buoy sunk on Seabed at 62m water depth using an AHTS along with diving and ROV services.